Bell Island Treatment Ponds Sludge Survey
Conhur provides sludge surveys for both sludge lagoons and oxidation ponds. We utilize the latest technology to provide as accurate a result as possible. Our sludge surverys provide estimates of:
The volume of sludge contained within the ponds
The average solids content of the sludge contained in the ponds
The total tonnes dry solids (tDS) contained within the ponds
Conhur was contracted by Nelson City Council to survey the sludge contained in the three facultative ponds and two maturation ponds at the Bell Island WWTP. The survey was undertaken over a period of two days form 9 to 10 November in wet, calm weather conditions. This was a follow up to an original survey completed by Conhur in November 2012.